The physical knock-down of a typical Melbourne house often takes only a few days — but the full process from first enquiry to a cleared site is longer. Here's a realistic breakdown.
Before the machines arrive
Permits and consents: a demolition permit from a registered building surveyor, and Section 29A consent where required, can take several weeks depending on your council.
Service abolishments: electricity, gas, water and telecommunications disconnections are arranged with the providers and can take several weeks — start these early.
Asbestos: if the home was built before 1990, an asbestos assessment — and licensed removal where asbestos is found — adds time before demolition can begin.
The demolition itself
For a standard single-storey home with reasonable access, the physical demolition and load-out typically takes a few days. Double-storey homes, tight inner-suburb blocks, or large volumes of concrete and brick take longer.
After the knock-down
Site clearance, levelling and final clean-up follow the demolition, leaving the block ready for your builder. We confirm the full timeline in your written quote.
Get a timeline for your property
Every property is different. Our team will inspect your home and give you a clear quote with a realistic schedule — free and no-obligation.
Discuss your property with our team
Free, no-obligation quotes directly from NextSite Demolition · 04 2226 9996.