Skip to main content

Melbourne & Victoria

Melbourne demolition planning guide

Start with the property, the work to be done and the finish you need. NextSite Demolition is licensed and insured for demolition and asbestos removal, and our team assesses, quotes and carries out the work directly.

Request a free, no-obligation quote

1. Define what stays and what goes

Identify the main building, outbuildings, slab, footings, paving, fences and vegetation. Mark retained structures and specify the final finish. Your builder’s requirements for the next stage may differ from a simple site clean-up.

Demolition quote scope checklist →

2. Confirm approvals for your address

Speak with your building surveyor and council about the demolition permit, any planning controls and report and consent. Heritage and adjoining-property issues can change what is possible. Do not assume that one council’s process or timeframe applies throughout Melbourne.

City of Melbourne: Section 29A guidance ↗

3. Assess asbestos before disturbance

Older buildings can contain asbestos. Share existing reports and arrange professional assessment for uncertain materials. Do not disturb material or take samples to request a quote. WorkSafe guidance addresses identifying asbestos and planning its removal before demolition or refurbishment.

Asbestos removal and safe quote enquiries →

4. Coordinate services, access and neighbours

Confirm who arranges service disconnections or relocations, which services remain, and what written confirmations are needed. Tell us about shared driveways, narrow gates, overhead lines, adjoining buildings and road access. These conditions affect safe planning and the quote.

5. Agree a written scope and handover

Confirm the price, GST, inclusions, exclusions and how changes are approved. State the waste removal and site finish required, with any disposal or inspection records. Timelines depend on approvals, service-provider work, asbestos and access; agree a programme for your actual project.

Focused guides for your project

Talk to NextSite about your property

Send your suburb, property type, proposed scope, plans and safe photographs. We will discuss assessment and a free, no-obligation quote. You deal directly with the demolition team.