By NextSite Demolition · Updated 3 November 2026
A demolished house produces an enormous amount of material — concrete, brick, timber, steel, plaster and general waste. Where it all goes matters for the environment and for your hip pocket: disposal and tipping fees are one of the biggest components of any demolition quote.
What gets recycled
Concrete and brick: crushed and reused as road base and aggregate. Clean loads are cheaper to dispose of than mixed waste.
Steel and metals: roofing, frames and reinforcement are almost always recycled, and the salvage value can offset your cost.
Timber and fittings: reusable doors, windows, floorboards and fixtures can be salvaged where they're in good condition.
What can't be recycled
Mixed general waste goes to licensed landfill, and tipping fees in Victoria continue to rise — which is why separating materials on site matters.
Asbestos is in a category of its own: it must be removed by licensed professionals, sealed, and transported to an EPA-approved facility. It can never go in a standard skip.
Why it matters for your quote
A quote that separates recyclable materials from general waste is usually sharper than one that treats everything as landfill. Ask what's included in disposal — our quotes itemise it clearly, with salvage credits applied where they're genuinely available.
Official sources
Checked 24 October 2026. Requirements depend on the site and proposed work; confirm current advice with your council and relevant professionals.
Discuss your property with our team
Free, no-obligation quotes directly from NextSite Demolition · 04 2226 9996.
