A knock-down-rebuild and a major renovation need separate, property-specific budgets. Compare the full scope, approvals, temporary accommodation, site preparation and new-build requirements rather than assuming either option is cheaper.
When KDR usually wins
Your existing home has structural issues, poor orientation or a layout that can't be fixed without moving walls everywhere. Ask your designer and builder to assess the condition and budget for both approaches; cost, energy performance and warranty arrangements depend on the actual proposal.
When renovation wins
Heritage overlays that prevent demolition, strong period character worth preserving, or when only one part of the home needs work. Partial demolition — removing a rear section while keeping the front — is a popular middle path in Melbourne's inner suburbs.
The demolition step
If you land on KDR, demolition needs its own assessed quote and programme, accounting for approvals, service work, asbestos and access. Getting a detailed quote from our team early gives you an accurate budget line before signing a build contract.